Technology Readiness Data: MTRAX Network / Infrastructure / Device Level
MTRAX Key Findings
Infrastructure/Testing Specifications
Infrastructure/Testing Specifications
The testing window and testing schedule provided by the school must adequately accommodate the number of student test sessions required. This is calculated based on: the number of testing locations, the number of days of scheduled testing, the number of testing periods per day, the maximum number of students to be accommodated in each location multiplied by the number of tests to be administered (i.e., mathematics, English language arts, etc.).